Forth Replacement Crossing Study - additional reports
Forth Replacement Crossing Study - technical reports (Nos. 1 - 5) and environmental report
| Report |
Description |
| No. 5 - Final Report |
A report drawing together the key findings from each package.
|
| No.5 - Final Report - Non-technical summary |
A non technical summary of the Final Report, summarising the findings of all the work undertaken during the course of the study is also available. |
| No. 4 - Appraisal of options |
Assess the FRC options using the Scottish Transport Appraisal Guidance (STAG) |
| No. 3 - Generate options for potential replacement crossing |
Identify options which will address and give solutions to the problems previously identified |
| No. 2 - Determining network performance |
Identify the level of performance we should expect from the network. Identify any problems |
| No. 1 - Assessment of transport network |
Assessment of existing and forecasted future conditions of the transport network within the corridors of Forth Road and Rail Bridges |
| Environmental report |
The Scottish Government has undertaken a Strategic Environmental Assessment (SEA) for the Forth Replacement Crossing Study, the findings of which are presented in this Environmental Report. This is in accordance with EC Directive 2001/42/EC and regulation 16(2) of the Environmental Assessment (Scotland) Act 2005 (2005 asp 15).
The Environmental Report will inform the progress of the Forth Replacement Crossing Study, promote sustainable development and increase public involvement in environmental decision making.
|