Road Projects Search Results
- Realignment and improvement of 3.3km of the carriageway between Dowhill and Chapeldonan
- The on-line widening of approximately 1.5 kilometres of existing trunk road to provide a dedicated southbound overtaking lane.
- Off-line construction of approximately one kilometre of new carriageway plus approximately 250 metres of on-line improvement at each end of the scheme.
- The project involves the construction of a northbound climbing lane on the A77, four kilometres north of the Cairnryan ferry terminal. The A77 will be widened to accommodate a 1,800 metre-long third lane.
- The project involves the construction of a new off-line bypass of the town of Maybole and associated junctions to connect to the existing A77 Trunk Road.
- There will be a widening of approximately 2.9km of existing Trunk Road to provide alternating dedicated northbound and southbound overtaking lane.
- This project includes the introduction of grade separated junctions at Symington and Bogend Toll on the A77 between Spittalhill Interchange and the roundabout at Dutch House.
- The improvement option involves the provision of approximately 1.3 kilometres of new, generally off-line, single 2-lane carriageway from the south of Crianlarich to the north of the village.
- The scheme provides partly offline improvements over a length of approximately 0.4 kilometres to remove the traffic lights and re-introduce 2-way traffic flow.
- Widening of single track length of A830 between Arisaig and Loch nan Uamh to allow for two way traffic.
