Road Projects Search Results
- Reconstruction of the southern approach viaduct to the existing Kincardine Bridge realignment of the northern approach to the bridge and works to guardrails or footways.
- Construction of a new 1.2 kilometre-long bridge across the Forth Estuary, together with 6.4 kilometres of approach road and associated works.
- The scheme consists of the provision of new slip roads on the west side of the A9 for Northbound travellers. The scheme was officially opened on 26 May 2008.
- Junction improvements to and from the village of Bankfoot will be undertaken to remove right turn manoeuvres.
- The project involves the construction of a new 1.7km overtaking lane, with associated drainage, surfacing and safety fencing improvements.
- 2.7 km extension to existing 1.6 km length of dual carriageway, north of Crubenmore.
- This project involves the construction of 2.1 kilometres of 6 metre-wide single carriageway, with 1 metre hard strips and a minimum soft verge width of 1.65 metres. At the northern end of the scheme, a 280 metre-long 10 metre-wide climbing lane has been provided.
- The project involves provision of approximately 5km of dualling between Kincraig and Dalraddy, North of Kingussie on the A9.
- This project upgrades the A9 to dual carriageway for 9km from the existing dual carriageway at Luncarty to the existing dual carriageway at Pass of Birnam.
- This project is now complete. It involved the construction of a new 1.06km northbound overtaking lane, with associated drainage, surfacing and safety fencing improvements.